1. Introduction to Environmental Approval Process System

The Environmental Approval Process System in Nepal is a comprehensive framework designed to ensure that development projects and activities are carried out in an environmentally sustainable manner. This system is governed by the Environment Protection Act, 2076 (2019) and the Environment Protection Rules, 2077 (2020), which provide the legal foundation for environmental protection and management in Nepal.

The primary objective of this system is to assess and mitigate potential environmental impacts of proposed projects, ensuring that they comply with national environmental standards and regulations. The Department of Environment (DoE), under the Ministry of Forests and Environment, is the central authority responsible for overseeing this process.

Key Components of the Environmental Approval Process

  1. Screening: Determining whether a project requires an environmental assessment
  2. Scoping: Identifying potential environmental impacts and issues to be studied
  3. Environmental Impact Assessment (EIA) or Initial Environmental Examination (IEE)
  4. Public consultation and participation
  5. Review and decision-making by the DoE
  6. Environmental monitoring and compliance

The Environmental Approval Process is crucial for sustainable development in Nepal, balancing economic growth with environmental conservation. It applies to a wide range of sectors, including infrastructure, industry, energy, and natural resource management.

2. Legal Requirements for Environmental Impact Assessment

The legal framework for Environmental Impact Assessment (EIA) in Nepal is primarily based on the following legislation:

  1. Environment Protection Act, 2076 (2019)
  2. Environment Protection Rules, 2077 (2020)
  3. National Environmental Impact Assessment Guidelines, 1993

Environment Protection Act, 2076 (2019)

This Act provides the overarching legal framework for environmental protection in Nepal. Section 3 of the Act mandates that an EIA or IEE must be conducted for prescribed projects or proposals that may have significant environmental impacts.

Key provisions include:

  • Section 3(1): Prohibition on implementing projects without environmental study
  • Section 3(2): Requirement for EIA or IEE based on the nature and impact of the project
  • Section 7: Powers of the concerned body to approve the environmental study report

Environment Protection Rules, 2077 (2020)

These Rules provide detailed procedures for conducting environmental assessments. Schedule 1, 2, and 3 of the Rules specify the types of projects requiring IEE or EIA.

Key rules include:

  • Rule 3: Procedures for conducting IEE
  • Rule 4: Procedures for conducting EIA
  • Rule 7: Review and approval process for environmental study reports

National Environmental Impact Assessment Guidelines, 1993

These guidelines provide a framework for the EIA process, including:

  • Screening criteria for projects
  • Scoping procedures
  • EIA report preparation and content requirements
  • Public consultation processes
  • Review and approval procedures

3. Documentation Requirements for Environmental Clearance Process

The documentation requirements for the Environmental Clearance Process in Nepal are extensive and vary depending on the type of assessment required (IEE or EIA). The following documents are typically required:

For Initial Environmental Examination (IEE)

  1. IEE Report: A comprehensive document detailing the environmental impacts and mitigation measures
  2. Terms of Reference (ToR): Outlining the scope and methodology of the IEE
  3. Project proposal: Detailed description of the proposed project
  4. Land ownership documents or lease agreements
  5. Topographic map of the project area
  6. Recommendation letter from the local government
  7. Public notice and public hearing minutes

For Environmental Impact Assessment (EIA)

  1. EIA Report: A detailed study of environmental impacts, alternatives, and mitigation measures
  2. Terms of Reference (ToR): Approved by the DoE, outlining the scope of the EIA
  3. Scoping document: Identifying key issues to be addressed in the EIA
  4. Project proposal: Comprehensive description of the proposed project
  5. Land ownership documents or lease agreements
  6. Topographic and cadastral maps of the project area
  7. Recommendation letters from local and provincial governments
  8. Public notice publications and public hearing minutes
  9. Expert team formation details for EIA study

Additional Documentation

  1. Baseline environmental data
  2. Environmental Management Plan (EMP)
  3. Social Impact Assessment (if applicable)
  4. Biodiversity Impact Assessment (if applicable)
  5. Resettlement Action Plan (if applicable)
  6. Indigenous Peoples Plan (if applicable)

All documents must be submitted in Nepali, with English translations where necessary. The DoE may request additional documentation based on the specific nature and location of the project.

4. Step-by-Step Process for Environmental Approval System

The Environmental Approval System in Nepal follows a structured process, as outlined in the Environment Protection Rules, 2077 (2020). Here’s a detailed step-by-step guide:

Step 1: Project Screening

  1. Determine if the project requires an IEE or EIA based on Schedules 1, 2, and 3 of the Environment Protection Rules
  2. Consult with the DoE if the project category is unclear

Step 2: Scoping (for EIA only)

  1. Prepare a scoping document outlining key environmental issues
  2. Submit the scoping document to the DoE for approval
  3. DoE reviews and approves the scoping document within 21 days

Step 3: Terms of Reference (ToR) Preparation

  1. Develop ToR based on the approved scoping document (for EIA) or project specifics (for IEE)
  2. Submit ToR to the DoE for approval
  3. DoE reviews and approves ToR within 15 days

Step 4: Environmental Study

  1. Conduct baseline studies and field investigations
  2. Analyze potential environmental impacts
  3. Develop mitigation measures and an Environmental Management Plan

Step 5: Report Preparation

  1. Prepare the IEE or EIA report following the approved ToR
  2. Ensure compliance with the National EIA Guidelines, 1993

Step 6: Public Consultation

  1. Publish a 15-day public notice in national newspapers
  2. Conduct public hearings in the project-affected area
  3. Incorporate public feedback into the report

Step 7: Report Submission

  1. Submit the final IEE or EIA report to the DoE
  2. Include all required supporting documents

Step 8: Review and Approval

  1. DoE reviews the report (21 days for IEE, 45 days for EIA)
  2. DoE may request additional information or clarifications
  3. DoE issues approval or rejection decision

Step 9: Environmental Clearance

  1. If approved, DoE issues an Environmental Clearance Certificate
  2. The certificate includes conditions for environmental management and monitoring

Step 10: Post-Approval Compliance

  1. Implement the Environmental Management Plan
  2. Conduct regular environmental monitoring
  3. Submit periodic compliance reports to the DoE

This process ensures a thorough assessment of environmental impacts and promotes sustainable development practices in Nepal.

Read More

  1. Corporate Social Responsibility in Nepal
  2. Financial Projection in Nepal
  3. Business Plan and Projection in Nepal: A Complete Guide

5. Government Fees Structure for Environmental Clearance

The government fees for environmental clearance in Nepal are structured based on the type of environmental assessment required and the scale of the project. The fee structure is outlined in the Environment Protection Rules, 2077 (2020) and may be subject to periodic revisions.

Fees for Initial Environmental Examination (IEE)

  1. Small-scale projects: NPR 25,000
  2. Medium-scale projects: NPR 50,000
  3. Large-scale projects: NPR 100,000

Fees for Environmental Impact Assessment (EIA)

  1. Small-scale projects: NPR 100,000
  2. Medium-scale projects: NPR 200,000
  3. Large-scale projects: NPR 500,000

Additional Fees

  1. Scoping document review fee (for EIA): NPR 25,000
  2. Terms of Reference (ToR) review fee: NPR 15,000
  3. Environmental Management Plan review fee: NPR 50,000

Fee Payment Process

  1. Fees must be paid to the Department of Environment through a designated bank account
  2. Proof of payment must be submitted along with the environmental assessment documents

It’s important to note that these fees are subject to change, and project proponents should verify the current fee structure with the DoE before initiating the environmental clearance process.

6. Timeline Requirements for Environmental Impact Assessment

The Environment Protection Rules, 2077 (2020) specify timeline requirements for various stages of the Environmental Impact Assessment process. Adhering to these timelines is crucial for efficient project implementation.

Initial Environmental Examination (IEE) Timeline

  1. Preparation and submission of IEE report: No specific timeline (project-dependent)
  2. DoE review and approval of IEE report: 21 days from the date of submission
  3. Public notice period: 15 days

Environmental Impact Assessment (EIA) Timeline

  1. Scoping document preparation and approval: 21 days for DoE review
  2. Terms of Reference (ToR) approval: 15 days for DoE review
  3. EIA study and report preparation: No specific timeline (project-dependent)
  4. Public notice period: 15 days
  5. DoE review and approval of EIA report: 45 days from the date of submission

Additional Timeline Considerations

  1. Request for additional information: DoE may request additional information within the review period
  2. Response to information requests: Project proponent must respond within 15 days
  3. Extension of review period: DoE may extend the review period by up to 15 days if necessary

It’s important to note that these are maximum timelines, and the actual process may be completed more quickly depending on the complexity of the project and the completeness of the submitted documents.

7. Compliance Guidelines for Environmental Regulations Process

Compliance with environmental regulations is a critical aspect of the Environmental Approval Process in Nepal. The following guidelines outline key compliance requirements:

Environmental Management Plan (EMP) Implementation

  1. Implement all mitigation measures outlined in the approved EMP
  2. Assign qualified personnel to oversee EMP implementation
  3. Maintain detailed records of all environmental management activities

Monitoring and Reporting

  1. Conduct regular environmental monitoring as specified in the EMP
  2. Submit bi-annual environmental monitoring reports to the DoE
  3. Allow DoE inspectors access to the project site for compliance verification

Pollution Control

  1. Adhere to national environmental quality standards for air, water, and noise pollution
  2. Install and maintain pollution control equipment as required
  3. Conduct regular testing of emissions and effluents

Waste Management

  1. Implement proper waste segregation, storage, and disposal practices
  2. Comply with the Solid Waste Management Act, 2068 (2011)
  3. Maintain records of waste generation, treatment, and disposal

Biodiversity Conservation

  1. Implement biodiversity conservation measures as outlined in the EIA/IEE
  2. Avoid or minimize impacts on protected areas and critical habitats
  3. Comply with the National Parks and Wildlife Conservation Act, 2029 (1973)

Community Engagement

  1. Maintain open communication channels with local communities
  2. Address community grievances promptly and effectively
  3. Implement agreed-upon community development programs

Emergency Preparedness

  1. Develop and maintain an emergency response plan
  2. Conduct regular emergency drills and training for staff
  3. Report any environmental incidents to the DoE immediately

Compliance Documentation

  1. Maintain a comprehensive environmental compliance file
  2. Keep all environmental permits and clearances up to date
  3. Document all communications with regulatory authorities

Adherence to these compliance guidelines ensures that projects maintain environmental standards throughout their lifecycle and contribute to sustainable development in Nepal.

8. Authorities Involved in Environmental Approval Process

The Environmental Approval Process in Nepal involves several governmental authorities at different levels. Understanding the roles and responsibilities of these authorities is crucial for navigating the approval process effectively.

Department of Environment (DoE)

The DoE, under the Ministry of Forests and Environment, is the primary authority responsible for environmental clearance.

Key responsibilities include:

  1. Reviewing and approving IEE and EIA reports
  2. Issuing environmental clearance certificates
  3. Monitoring compliance with environmental regulations
  4. Conducting environmental audits

Ministry of Forests and Environment

  1. Formulating national environmental policies and regulations
  2. Overseeing the DoE and other environmental agencies
  3. Final decision-making authority for complex or controversial projects

Provincial Ministries of Industry, Tourism, Forest and Environment

  1. Reviewing and approving IEE reports for projects within their jurisdiction
  2. Coordinating with the DoE on EIA processes
  3. Monitoring environmental compliance at the provincial level

Local Governments

  1. Providing recommendations for project approval
  2. Facilitating public consultations and hearings
  3. Monitoring local environmental impacts of projects

Sector-Specific Authorities

Depending on the nature of the project, other authorities may be involved:

  1. Department of Electricity Development (for hydropower projects)
  2. Department of Roads (for road construction projects)
  3. Department of Mines and Geology (for mining projects)
  4. Nepal Tourism Board (for tourism-related projects)

Environmental Protection Council

  1. Providing high-level guidance on environmental policies
  2. Resolving inter-ministerial issues related to environmental management

National Planning Commission

  1. Integrating environmental considerations into national development plans
  2. Ensuring alignment of projects with national development goals

Understanding the roles of these authorities and maintaining effective communication with them is essential for a smooth environmental approval process in Nepal.

9. Post Approval Requirements for Environmental Clearance

Obtaining environmental clearance is not the end of the process. Project proponents must fulfill several post-approval requirements to maintain compliance and ensure environmental protection throughout the project lifecycle.

Implementation of Environmental Management Plan (EMP)

  1. Execute all mitigation measures outlined in the approved EMP
  2. Allocate sufficient resources for EMP implementation
  3. Train staff on environmental management procedures

Environmental Monitoring

  1. Conduct regular environmental monitoring as specified in the EIA/IEE report
  2. Monitor key environmental parameters (air quality, water quality, noise levels, etc.)
  3. Maintain detailed records of all monitoring activities

Periodic Reporting

  1. Submit bi-annual environmental monitoring reports to the DoE
  2. Report any significant environmental incidents or non-compliances immediately
  3. Provide annual environmental audit reports as required

Compliance with Approval Conditions

  1. Adhere to all conditions specified in the environmental clearance certificate
  2. Implement any additional measures required by the DoE during the approval process
  3. Obtain necessary permits for specific activities (e.g., tree cutting, water use)

Public Disclosure and Stakeholder Engagement

  1. Make environmental monitoring reports available to the public
  2. Continue engagement with local communities and stakeholders
  3. Address public concerns and grievances promptly

Environmental Auditing

  1. Conduct internal environmental audits at regular intervals
  2. Facilitate external audits by the DoE or third-party auditors
  3. Implement corrective actions based on audit findings

Renewal of Environmental Clearance

  1. Apply for renewal of the environmental clearance certificate before expiry
  2. Update the EMP based on operational experiences and changing conditions
  3. Conduct a fresh environmental assessment if required by the DoE

Decommissioning and Closure Planning

  1. Develop and implement a decommissioning plan at the end of the project lifecycle
  2. Ensure proper site restoration and environmental rehabilitation
  3. Conduct post-closure monitoring as required by the DoE

Compliance with these post-approval requirements is essential for maintaining the validity of the environmental clearance and ensuring long-term environmental sustainability of projects in Nepal.

10. Legal Framework Governing Environmental Assessment Process

The environmental assessment process in Nepal is governed by a comprehensive legal framework that includes acts, rules, guidelines, and international conventions. Understanding this framework is crucial for compliance with environmental regulations.

Primary Legislation

  1. Environment Protection Act, 2076 (2019)
    • Provides the overarching legal basis for environmental protection
    • Mandates environmental studies for prescribed projects
    • Establishes penalties for non-compliance
  2. Environment Protection Rules, 2077 (2020)
    • Details procedures for conducting IEE and EIA
    • Specifies projects requiring environmental assessment
    • Outlines the review and approval process

Sector-Specific Laws

  1. Forest Act, 2076 (2019)
    • Regulates activities affecting forest areas
    • Requires forest clearance for projects in forested regions
  2. National Parks and Wildlife Conservation Act, 2029 (1973)
    • Protects biodiversity and wildlife habitats
    • Imposes restrictions on activities in protected areas
  3. Water Resources Act, 2049 (1992)
    • Governs the use and management of water resources
    • Requires water use licenses for certain projects

Guidelines and Standards

  1. National Environmental Impact Assessment Guidelines, 1993
    • Provides detailed guidance on EIA methodology
    • Outlines report preparation and review procedures
  2. Environmental Standards
    • National Ambient Air Quality Standards, 2069 (2012)
    • National Water Quality Standards, 2065 (2008)
    • National Noise Standard, 2068 (2012)

International Conventions

  1. Convention on Biological Diversity (CBD)
  2. United Nations Framework Convention on Climate Change (UNFCCC)
  3. Convention on International Trade in Endangered Species (CITES)

Other Relevant Laws

  1. Land Acquisition Act, 2034 (1977)
  2. Solid Waste Management Act, 2068 (2011)
  3. Labor Act, 2074 (2017)

This legal framework ensures that environmental assessments in Nepal are conducted comprehensively, considering various aspects of environmental and social protection. Project proponents must ensure compliance with all relevant laws and regulations throughout the environmental assessment process.

11. Services Offered by Department of Environment

The Department of Environment (DoE) in Nepal offers a range of services to facilitate environmental protection and sustainable development. These services are crucial for project proponents, environmental professionals, and the general public.

Environmental Clearance Services

  1. Review and approval of IEE and EIA reports
  2. Issuance of environmental clearance certificates
  3. Guidance on environmental assessment procedures

Technical Support and Consultation

  1. Pre-consultation meetings for project proponents
  2. Technical advice on environmental mitigation measures
  3. Assistance in interpreting environmental regulations

Environmental Monitoring and Compliance

  1. Site inspections and environmental audits
  2. Review of environmental monitoring reports
  3. Enforcement of environmental regulations

Environmental Quality Testing

  1. Air quality monitoring services
  2. Water quality testing
  3. Noise level measurements

Capacity Building and Training

  1. Training programs on environmental assessment methodologies
  2. Workshops on environmental compliance and management
  3. Seminars on emerging environmental issues

Information and Data Services

  1. Maintenance of environmental database
  2. Provision of environmental baseline data
  3. Dissemination of environmental reports and studies

Public Awareness and Education

  1. Environmental awareness campaigns
  2. Publication of educational materials on environmental protection
  3. Facilitation of public participation in environmental decision-making

Policy Development and Research

  1. Contribution to national environmental policies
  2. Conducting research on environmental issues
  3. Collaboration with academic and research institutions

International Cooperation

  1. Coordination with international environmental agencies
  2. Participation in global environmental initiatives
  3. Facilitation of technology transfer in environmental management

Grievance Redressal

  1. Handling public complaints related to environmental issues
  2. Mediation in environmental disputes
  3. Investigation of environmental violations

These services demonstrate the DoE’s comprehensive role in environmental management in Nepal, supporting both regulatory compliance and environmental conservation efforts.

12. Renewal Process for Environmental Clearance Certificates

Environmental Clearance Certificates in Nepal are typically valid for a specific period, after which they must be renewed to ensure continued compliance with environmental regulations. The renewal process is crucial for maintaining the legal status of projects and adapting to any changes in environmental conditions or regulations.

Renewal Timeline

  1. Environmental Clearance Certificates are generally valid for 5 years
  2. Renewal application should be submitted at least 3 months before the expiry date

Renewal Application Requirements

  1. Completed renewal application form
  2. Updated Environmental Management Plan (EMP)
  3. Environmental compliance report for the previous period
  4. Environmental monitoring reports
  5. Audit reports (if conducted)
  6. Any changes or modifications to the project since the last approval

Renewal Process Steps

  1. Submit renewal application to the Department of Environment (DoE)
  2. DoE reviews the application and compliance history
  3. Site inspection may be conducted by DoE officials
  4. DoE may request additional information or clarifications
  5. Public consultation may be required if significant changes have occurred
  6. DoE decides on renewal, which may include new conditions or requirements

Fees for Renewal

  1. Renewal fees are typically lower than initial clearance fees
  2. Fees vary based on project scale and type of assessment (IEE or EIA)

Conditions for Renewal

  1. Satisfactory compliance with previous environmental clearance conditions
  2. Implementation of the approved Environmental Management Plan
  3. Regular submission of environmental monitoring reports
  4. No significant unresolved environmental issues or complaints

Potential Outcomes

  1. Renewal granted with existing conditions
  2. Renewal granted with additional conditions or requirements
  3. Renewal denied due to non-compliance or significant environmental concerns
  4. Requirement for a new environmental assessment if substantial changes have occurred

Legal Implications

  1. Operating without a valid Environmental Clearance Certificate is a violation of the Environment Protection Act, 2076 (2019)
  2. Penalties may be imposed for failure to renew or operating with an expired certificate